SOLUTION: A farmer has two tractors P and Q. Tractor P, working alone, can plough a piece of land in 5 hours while tractor Q would take 1.6667 hours less than tractor P. (a) Determine the

Algebra.Com
Question 1180858: A farmer has two tractors P and Q. Tractor P, working alone, can plough a piece of land in 5 hours while tractor Q would take 1.6667 hours less than tractor P.
(a) Determine the time the two tractors ploughing together,would take to complete the work. (3 marks)
(b) One day, the tractors started to plough the piece of land together. After 40 minutes,tractor P broke down but Q continued alone and completed the work.
Calculate the total time taken to plough the piece of land that day. (4 marks)
(c) In another season, the farmer hired an additional tractor R to assist P and Q which retained the same rate of working as before. The three tractors took I hour 12 minutes to plough the same piece of land. The owner of tractor R was paid some money proportional to the work done by the tractor.
If the total work was valued at ksh 20000 , find the amount of money paid to the owner of tractor R.

Found 2 solutions by ikleyn, greenestamps:
Answer by ikleyn(52781)   (Show Source): You can put this solution on YOUR website!
.


            I will solve part  (a)  ONLY,  and later will explain you  WHY.


The rate of work of tractor P is    of the job per hour.


The rate of work of tractor Q is   =   of the job per hour.

    Notice that   represents    hours = 1.6667 hours)


Their combined rate is   +  =   of the job per hour.


It means that both tractors will complete the job in    hours, or  1 hour and 15 minutes, working together.    ANSWER

Solved.

----------------

It is a standard and typical joint work problem.

There is a wide variety of similar solved joint-work problems with detailed explanations in this site.  See the lessons
    - Using Fractions to solve word problems on joint work
    - Solving more complicated word problems on joint work
    - Selected joint-work word problems from the archive


Read them and get be trained in solving joint-work problems.

Also,  you have this free of charge online textbook in ALGEBRA-I in this site
    - ALGEBRA-I - YOUR ONLINE TEXTBOOK.

The referred lessons are the part of this textbook under the topic
"Rate of work and joint work problems"  of the section  "Word problems".


Save the link to this online textbook together with its description

Free of charge online textbook in ALGEBRA-I
https://www.algebra.com/algebra/homework/quadratic/lessons/ALGEBRA-I-YOUR-ONLINE-TEXTBOOK.lesson

to your archive and use it when it is needed.



//////////// and now the explanation WHY \\\\\\\\\\\\\\\\\


One and ONLY ONE problem/question per post.



It is the RULE,  the  POLICY  and the  REQUIREMENT  of this forum.

It is written in this page

https://www.algebra.com/tutors/students/ask.mpl?action=ask_question&topic=Equations&return_url=http://www.algebra.com/algebra/homework/equations/

from which you post your problems.


It is assumed that you read these rules before posting.

It is also assumed that you do understand what is written in that page and follow the rules.


Those who violate them,  work against their own interests.


*******************************************************************

        So   P L E A S E   post your problems   S E P A R A T E L Y  (!)

*******************************************************************


Answer by greenestamps(13200)   (Show Source): You can put this solution on YOUR website!


The other tutor answered only one question because of an unreasonable interpretation of the rule "one question per post".

Your post is not several separate unrelated questions; it is a single problem with three related questions. Posting the three questions as separate posts would make no sense; they NEED TO BE posted together.

The other tutor also misread the information in the first part of the problem and so gave a solution to a different problem.

-------------------------------------------------------------------------

(a) Tractor P can do the job alone in 5 hours; tractor Q can do it in (5-1.6667)=3.333 hours. So P can do (1/5) of the job in 1 hour and Q can do (1/3.333) = 3/10 of the job in 1 hour.

Working together then, the two tractors can do 1/5+3/10 = 1/2 of the job in 1 hour; so they can do the job together is 1/(1/2) = 2 hours.

ANSWER: 2 hours

(b) P and Q work together for 40 minutes (2/3 of an hour). Since together they can do 1/2 of the job in one hour, they do of the job in 40 minutes.

So 2/3 of the job remains to be done. The additional time it takes Q to finish the job, working at 3/10 of the job per hour, is hours.

That's an additional 2 2/9 hours, or 2 hours 13 1/3 minutes to finish the job.

ANSWER: 40 minutes plus 2 hours 13 1/3 minutes = 2 hours 53 1/3 minutes.

(c) The three tractors together take 1 hour 12 minutes to finish the job together, or 6/5 hours. That means they do 5/6 of the job together in 1 hour.

P and Q together do 1/2 of the job in 1 hour. So tractor R in 1 hour does of the job.

The three tractors together finished the job in 6/5 hours, so the fraction of the job done by tractor R was .

So the amount to be paid to the owner of tractor R is 2/5 of the total of ksh 20000, or ksh 8000.

ANSWER: ksh 8000


RELATED QUESTIONS

A farmer has two tractors P and Q. Tractor P, working alone, can plough a piece of land... (answered by ikleyn)
A construction firm has two tractors T one , and T two. both tractors working together... (answered by ankor@dixie-net.com,josgarithmetic)
A carabao can plough a farmer's land in 6 hours. A tractor can plough the land in 4... (answered by Theo)
if 1 tractor ploughs a field in 5.6 hours and another can plough the same field in 2.8... (answered by Alan3354,macston)
using 2 tractors a farmer can plough a piece of land in 10 days .The farmer uses 2... (answered by josgarithmetic)
A farmer plough his land in 12 days if He uses 5 tractor s. How long will it take if He... (answered by josgarithmetic,ankor@dixie-net.com,greenestamps)
1). A team of workers must to finish 360 parts. They finish 4 more parts in a day so... (answered by ankor@dixie-net.com)
jones can plough his field with his tractor in 4 hours. if he uses his manual plough, it... (answered by richwmiller)
- One tractor can plow a field in 8 hours and another in 10 hours. In how many hours can... (answered by richwmiller)