SOLUTION: A chain saw requires 3 hours of assembly and a wood chipper 5 hours. A maximum of 45 hours of assembly time is available. The profit is $ 160 on a chain saw and $ 240 on a chipper.

Algebra.Com
Question 1139948: A chain saw requires 3 hours of assembly and a wood chipper 5 hours. A maximum of 45 hours of assembly time is available. The profit is $ 160 on a chain saw and $ 240 on a chipper. How many of each should be assembled for maximum​ profit?
To attain the maximum​ profit, assemble
nothing chain saws and
nothing wood chippers.  

Answer by Theo(13342)   (Show Source): You can put this solution on YOUR website!
i solved this graphically as shown below:

$$$

the area of the graph that is not shaded is the region of feasibility.

to find that region, i graphed the opposite of the inequalities formed by the constraints of the problem.

the constraints of the problem were:

3x + 5y <= 45
x >= 0
y >= 0

i graphed:

3x + 5y >= 45
x <= 0
y <= 0

the corner points of the feasible region are where the maximum / minimum solutions lie.

the objective function, which was profit = 160x + 240y, was evaluated at each of these corner points.

at (0,9), the profit was 240 * 9 = 2160

at (15,0), the profit was 160 * 15 = 2400.

maximum profit was 2400 when 15 chains saws and zero chippers were assembled.

unfortunately, there was no happy middle ground for maximum profit.

for example, when x = 5, y = 6 and the profit was 160 * 5 + 240 * 6 = 2240.

that was actually better than one of the corner points but not better than the other.







RELATED QUESTIONS

A chain saw requires hours of assembly and a wood chipper hours. A maximum of 45 hours of (answered by ikleyn)
A chain saw requires 3 hours of assembly and a wood chipper 7 hours. A maximum of 42... (answered by ikleyn)
A chain saw requires 7 hours of assembly and a wood chipper 6 hours. A maximum of 126... (answered by ikleyn)
A chain saw requires 8 hours of assembly and a wood chipper 4 hours. A maximum of 96... (answered by ikleyn)
A chain saw requires 4 hours of assembly and a wood chipper 6 hours. A maximum of 48... (answered by ikleyn,Theo)
A chainsaw requires 3 hours of assembly and a wood chipper 5 hours. A maximum of 30 hours (answered by TimothyLamb)
A television manufacturing company makes three models of television sets. The super... (answered by Theo)
A manufacturer produces two models of mountain bikes. Model A requires 5 hours of... (answered by ikleyn)
A manufacturer produces two models of mountain bikes. Model A requires 5 hours of... (answered by greenestamps,ikleyn)