SOLUTION: A piece of manufacturing equipment can produce enough items to fill an order in 10 hours. If an auxiliary piece of equipment is used also, it will take 7 hours. How long would it t

Algebra.Com
Question 1095086: A piece of manufacturing equipment can produce enough items to fill an order in 10 hours. If an auxiliary piece of equipment is used also, it will take 7 hours. How long would it take the auxiliary equipment to fill the order working alone?
Found 2 solutions by ikleyn, greenestamps:
Answer by ikleyn(52787)   (Show Source): You can put this solution on YOUR website!
.
The combined rate of work is  of the job per hour.

The known individual rate of work is .


It implies that the unknown individual rate of work is  =  = .


Hence, it will take  = 23 hours and 20 minutes for the auxiliary equipment to fill the order working alone.


It is a typical joint work problem.

There is a wide variety of similar solved joint-work problems with detailed explanations in this site.  See the lessons
    - Using Fractions to solve word problems on joint work
    - Solving more complicated word problems on joint work
    - Selected joint-work word problems from the archive


Read them and get be trained in solving joint-work problems.

Also,  you have this free of charge online textbook in ALGEBRA-I in this site
    - ALGEBRA-I - YOUR ONLINE TEXTBOOK.

The referred lessons are the part of this textbook under the topic
"Rate of work and joint work problems"  of the section  "Word problems".


Save the link to this online textbook together with its description

Free of charge online textbook in ALGEBRA-I
https://www.algebra.com/algebra/homework/quadratic/lessons/ALGEBRA-I-YOUR-ONLINE-TEXTBOOK.lesson

to your archive and use it when it is needed.



Answer by greenestamps(13200)   (Show Source): You can put this solution on YOUR website!

The solution supplied by ikleyn is a perfectly good traditional algebraic one. I find many students prefer a different method. Here it is for your problem; give it a try and see if maybe it "works" better for you than the traditional algebraic method.

(1) Take the 10 hours that the one piece of equipment takes to do the job, and the 7 hours that it takes the two pieces together to do the same job.

(2) Consider a period of 70 hours, where 70 is the least common multiple of 10 and 7. In those 70 hours, the first piece of equipment could do this job 70/10 = 7 times; together the two pieces of equipment could do the job 70/7 = 10 times. That means the second piece of equipment could do the job 3 times in those 70 hours. Doing the job 3 times in 70 hours means doing the job once in 70/3 hours.

Answer: 70/3 hours, or 23 1/3 hours.

RELATED QUESTIONS

A piece of manufacturing equipment valued at $125,000 depreciates at a steady rate of 10% (answered by rfer)
A piece of equipment used in a landfill has an original value of $200,000. After two... (answered by ikleyn)
Pump A can fill an empty 10,000 gallon tank in 4 hours, and auxiliary pump B can fill the (answered by ikleyn)
An electric hoist consists of a drum 10 inches in diameter that lifts a load by winding a (answered by htmentor)
An old piece equipment can print, stuff, and label 38 mailing pieces per minute. A newer (answered by josmiceli)
A machine can fill 1000 cases of soda cans in 3 hours. A second machine requires 5 hours... (answered by scott8148)
If a woman works for 3 1/2 hours per day, she can finish a piece of work in 10 days. How... (answered by Theo)
Lisa can fill a order in 9 hours. Tom can fill an order in 10 hours. How long will it... (answered by ikleyn)
An electric hoist is used to lift a piece of equipment. The diameter of the drum on the (answered by lwsshak3)