SOLUTION: At GE, shift one produced 4 times as much as shift two. GE's total production for July was 5,500 jet engines. What was the output for each shift? Thanks!

Algebra.Com
Question 109025: At GE, shift one produced 4 times as much as shift two. GE's total production for July was 5,500 jet engines. What was the output for each shift?
Thanks!

Answer by edjones(8007)   (Show Source): You can put this solution on YOUR website!
Let x=shift 2's production
4x+x=5500
5x=5500
x=1100 shift 2's production.
4x=4400 shift 1's production.
Ed

RELATED QUESTIONS

At GE shift 1 produced 4 times as much as shift 2. GE's total production for July was... (answered by bucky)
At General Electric, shift 1 produced 4 times as much as shift 2. General Electric’s... (answered by checkley77)
At General Electric, shift 1 produced 4 times as much as shift 2. General Electric's... (answered by ikleyn)
Honda day shift produced 4 times as much as shift 2. The total production for the month... (answered by Sarpi)
At Maplewood Marine, shift 1 produced 3 times as much as shift 2. Maplewood's total... (answered by ichudov)
In Ryan Corporation, the first shift produced 5 1/2 times as many lightbulbs as the... (answered by rfer,richwmiller)
A furniture store produces three times as many beds on shift two as on shift one. If a... (answered by josgarithmetic)
The Rand Co. produces 11 times as many rings on shift one as on shift two. If a total of... (answered by greenestamps,mananth)
In Ajax Corporation, the first shift produced 4 1/2 times as many lightbulbs as the... (answered by stanbon)