SOLUTION: A construction crew is lengthening a road. Let
L
be the total length of the road (in miles). Let
D
be the number of days the crew has worked. Suppose that
=L+4D200
gives
Algebra.Com
Question 1027962: A construction crew is lengthening a road. Let
L
be the total length of the road (in miles). Let
D
be the number of days the crew has worked. Suppose that
=L+4D200
gives
L
as a function of
D
. The crew can work for at most
70
days.
Identify the correct description of the values in both the domain and range of the function. Then, for each, choose the most appropriate set of values.
Answer by Alan3354(69443) (Show Source): You can put this solution on YOUR website!
A construction crew is lengthening a road. Let
L
be the total length of the road (in miles). Let
D
be the number of days the crew has worked. Suppose that
=L+4D200
gives
L
as a function of
D
. The crew can work for at most
70
days.
===============
=L+4D200 is not clear, not an equation.
RELATED QUESTIONS
A construction crew is lengthening a road that originally measured miles. The crew is... (answered by josgarithmetic)
A construction crew is lengthening a road that originally measured 52 miles. The crew is... (answered by ikleyn)
A construction crew is lengthening a road. Let "L" be the total length of the road (in... (answered by josgarithmetic)
A construction crew built 1/4 miles of road in 1/8 days what is the unit rate in miles... (answered by Alan3354)
A crew of 30 people can build a certain road in 60 days. After the tenth day the plans... (answered by richwmiller)
A construction crew has just finished building a road. The crew worked for
5 5/6 days.... (answered by ikleyn)
COMBINED VARIATION
The amount of time it takes to build a road varies directly with... (answered by josgarithmetic)
A road is tangent to a circular lake. Along the road and 12 miles from the point of... (answered by Alan3354)
Road A is twice as long as Road B. Road C is 3.5 km shorter than three times the length... (answered by Fombitz)