SOLUTION: Hello! I need help solving this...It takes Marcy’s apprentice 9 h longer to build a deck than it takes Marcy, an experienced carpenter. When they work together, they can build the
Algebra.Com
Question 728391: Hello! I need help solving this...It takes Marcy’s apprentice 9 h longer to build a deck than it takes Marcy, an experienced carpenter. When they work together, they can build the deck in 20h. How long would it take each person to build the deck working alone?
Answer by ankor@dixie-net.com(22740) (Show Source): You can put this solution on YOUR website!
It takes Marcy’s apprentice 9 h longer to build a deck than it takes Marcy, an experienced carpenter.
When they work together, they can build the deck in 20h.
How long would it take each person to build the deck working alone?
:
let m = M's time to build the deck alone
then
(m+9) = Apprentice time to do the job
:
Let the completed job = 1
:
Each will do a fraction of the job, the two fractions add up to 1.
:
A typical shared work equation
:
+ = 1
multiply by m(m+9), cancel the denominators, resulting in:
20(m+9) + 20m = m(m+9)
20m + 180 + 20m = m^2 + 9m
Combine like terms on the right side
0 = m^2 + 9m - 40m - 180
A quadratic equation
m^2 - 31m - 180 = 0
You can use the quadratic formula here, but this will factor to
(m-36)(m+5) = 0
The positive solution
m = 36 hrs M, working alone
then
36 + 9 = 45 hrs the apprentice working alone
:
:
See if that adds up using a calc
+ = 1
.56 + .44 = 1
RELATED QUESTIONS
it takes an apprentice carpenter 2h longer to install a section of floor than it does a... (answered by josgarithmetic)
An apprentice mason takes 8h longer to build a small fireplace than an experienced mason. (answered by Paul)
A demolition company wants to build a brick wall to hide from public view of the area... (answered by checkley77)
How do I solve this? Can you show me the work as well? I am lost. Thank you.
Working... (answered by josgarithmetic)
It takes an apprentice twice as long as the experienced plumber to replace the pipes... (answered by josmiceli)
It takes an apprentice four times as long as the experienced plumber to replace the pipes (answered by CubeyThePenguin)
I need help understanding how to solve and write this problem. I also want to understand... (answered by edjones)
Good Day,
I really need your help in solving this problem:
It takes Robert 9 hr... (answered by TimothyLamb)
An experienced bricklayer can build a wall three times as fast as an apprentice... (answered by josgarithmetic)