SOLUTION: A concrete driveway measures 18 yards by 4 yards. The driveway will be 0.5 yards thick. (a) How many cubic yards of concrete will be needed? (b) How much will it cost if concrete i

Algebra ->  Algebra  -> Exponents -> SOLUTION: A concrete driveway measures 18 yards by 4 yards. The driveway will be 0.5 yards thick. (a) How many cubic yards of concrete will be needed? (b) How much will it cost if concrete i      Log On

Ad: Algebrator™ solves your algebra problems and provides step-by-step explanations!
Ad: Algebra Solved!™: algebra software solves algebra homework problems with step-by-step help!

   


Question 112300: A concrete driveway measures 18 yards by 4 yards. The driveway will be 0.5 yards thick. (a) How many cubic yards of concrete will be needed? (b) How much will it cost if concrete is $3.50 per cubic yard?
Answer by checkley71(8403) About Me  (Show Source):
You can put this solution on YOUR website!
18*4*.5=36 YDS^3 IS THE AMOUNT OF CONCRETE NEEDED.
36*3.5=$126 FOR THE COST.