SOLUTION: Suppose that the amount of time it takes to build a highway varies directly with the length of the highway and inversely with the number of workers. Suppose also that it takes 300
Algebra.Com
Question 823296: Suppose that the amount of time it takes to build a highway varies directly with the length of the highway and inversely with the number of workers. Suppose also that it takes 300 workers 22 weeks to build 24 miles of highway. How long will it take 225 workers to build 27 miles of highway?
Found 2 solutions by richwmiller, TimothyLamb:
Answer by richwmiller(17219) (Show Source): You can put this solution on YOUR website!
300*22=6600 worker weeks
6600/24=275
275 worker weeks per mile
27*275=7425 worker weeks
7425/225=33 weeks
Answer by TimothyLamb(4379) (Show Source): You can put this solution on YOUR website!
---
t = K(L/w)
K = t(w/L)
---
K = 22(300/24)
K = 275
---
t = K(L/w)
t = 275(27/225)
t = 33 weeks
---
Solve and graph linear equations:
https://sooeet.com/math/linear-equation-solver.php
---
Solve quadratic equations, quadratic formula:
https://sooeet.com/math/quadratic-formula-solver.php
---
Solve systems of linear equations up to 6-equations 6-variables:
https://sooeet.com/math/system-of-linear-equations-solver.php
RELATED QUESTIONS
Suppose that the amount of time it takes to build a highway varies directly with the... (answered by lwsshak3)
Suppose that the amount of time it takes to build a highway varies directly with the... (answered by ikleyn)
COMBINED VARIATION
The amount of time it takes to build a road varies directly with... (answered by josgarithmetic)
The amount of time it takes p people to paint d doors varies directly with the number of... (answered by rothauserc)
Using k as the constant of variation, write the equation of variation for each following.
(answered by mananth)
If A varies directly with the square of the length L and inversely with the parameter p,... (answered by jojo14344)
The amount of water pumped through a hose varies directly as the square of the diameter... (answered by lwsshak3)
The time T to do a job varies inversely as the number of
people P working. It takes... (answered by richwmiller)
The time it takes to build a brick wall varies inversely as the number of people working... (answered by ankor@dixie-net.com)