SOLUTION: If 6 men can dig a hole in 10 days how many days will it take 12 men to dig the same hole at the same rate?
Algebra.Com
Question 1189492: If 6 men can dig a hole in 10 days how many days will it take 12 men to dig the same hole at the same rate?
Answer by ikleyn(52778) (Show Source): You can put this solution on YOUR website!
.
The whole job is 6*10 = 60 man-days.
12 men will complete it in = 5 days. ANSWER
Solved.
RELATED QUESTIONS
10 men take 7 days to dig a hole. how many days will it take 4 men to dig the same hole... (answered by stanbon)
if 4 men work for 6 hours a day for 3 days to dig a hole. how long will it take 12 men to (answered by macston)
6 men can dig a trench in 3 days. How many days will it take 9 men to dig the same trench (answered by Edwin McCravy)
if 12 men can dig a trench in 8 days, how many men can dig it in 6 days at the same rate?
(answered by josmiceli,ptaylor)
If it takes 8 men 9 hours to dig a hole in 20 minutes,how long would it take 10 men to... (answered by josgarithmetic)
If it takes 8 men 9 hours to dig a hole in 20 meters deep,how long would it take 10 men... (answered by ankor@dixie-net.com)
if it takes 4 men 12 days to dig a hole, how long would it take 6... (answered by ptaylor)
It takes one man one day to dig a 2m x 2m x 2m hole. How many days will it take 3 men... (answered by ankor@dixie-net.com)
7 men can dig a drain in 10 days. how many men would dig the same drain in 14 days
(answered by josgarithmetic,ikleyn,greenestamps)